2016-01-05-MIPO

Agenda

  • Actions
  • Decay solenoid FuG power supply – SG
  • Focus Coil/Hydrogen system - SW/JB
    • Current Status - JB
      • Vacuum environment/end caps
      • H2 absorber - cooling.
      • Solenoid alignment.
  • Spectrometer solenoid – MP/AB
    • QD/QP
    • Repair Plan.
      • Cold Mass
      • Cryostating
  • Magnet Flushing
  • PRY
  • Project Planning Meeting 12th Jan 16 in Hamilton Room, Coseners House
  • Hall tasks Jan 2016
    http://micewww.pp.rl.ac.uk/projects/operations/wiki/WorkPlanJanuary2016
  • AOB

Documents

Teddington Quote, bellows 28471_STFC_copy.pdf
JHC Magnetic alignment Alignments-June-2015.pdf
Magnet Alignment CW Magnet_alignment_CW.pdf
Magnet Flush test HN_Magnet_Flush_Test_Dec_2015.pdf
Project Planning Meeting Project_Planning_Meeting_12th_January_2016.pdf
Teddington bellows Sketch 2847115_1B_STFC.pdf
Jason tarrant Adjustable bellows drawing TD-1189-8305_2015-09-24_WIP.pdf
CW notes MIPO_Jan_5th_2016_CW_Notes.pdf

Phone Details

UK - 0844 473 7373
US - 1 415 363 0833
PIN 801140

14.00 UK Atlas POD
08.00 US

28471_STFC_copy.pdf (836 kB) Whyte, Colin, 04 January 2016 18:39

HN_Magnet_Flush_Test_Dec_2015.pdf (19 kB) Whyte, Colin, 04 January 2016 18:46

Alignments-June-2015.pdf (328.2 kB) Whyte, Colin, 04 January 2016 18:52

Magnet_alignment_CW.pdf (28.4 kB) Whyte, Colin, 04 January 2016 19:04

Project_Planning_Meeting_12th_January_2016.pdf (29.8 kB) Whyte, Colin, 04 January 2016 20:20

Realign-SSD-2016-01-05__Compatibility_Mode_.pdf (600.5 kB) Cobb, John, 05 January 2016 14:20

2847115_1B_STFC.pdf (26.4 kB) Whyte, Colin, 05 January 2016 17:51

TD-1189-8305_2015-09-24_WIP.pdf (231.2 kB) Whyte, Colin, 05 January 2016 17:51

MIPO_Jan_5th_2016_CW_Notes.pdf (60.6 kB) Whyte, Colin, 05 January 2016 17:55