Project

General

Profile

2015-04-28-MIPO

Agenda :-

  1. Actions and MEMO report
  2. 15-04-14 Minutes MeetingMinutes-150414.pdf
  3. Bellows discussion for field measurements
    1. Lock out bolts to react load
    2. Design changes to future bellows purchase?
  4. North PRY
    1. Transportation plans to RAL
    2. Lifting and handling
  5. Cooling demo PRY design
    1. Requirements and critical dates
    2. Current design
  6. LiH Absorber quotation update
  7. AOB

Supporting Documents :-

Layout of the PRY for the Cooling Demo for discussion from Steve Plate - Step_V_Prime_Layout.pptx
Layout of the waveguides above the Cooling Channel - RF_Waveguides_1.jpg
Bellows assembly drawing - 26L201A.pdf
Bellows flange drawing - 26L200A.pdf
Bellows specification document - Bellows_Specification_draft_1.doc

Phone Details :-

UK - 0844 473 7373
US – 1 415 363 0833
PIN - 801140

Step_V_Prime_Layout.pptx (293 KB) Preece, Roy, 27 April 2015 23:57

RF_Waveguides_1.jpg (285 KB) Preece, Roy, 28 April 2015 00:02

26L201A.pdf (196 KB) Preece, Roy, 28 April 2015 05:46

26L200A.pdf (200 KB) Preece, Roy, 28 April 2015 06:01

Bellows_Specification_draft_1.doc (2.44 MB) Preece, Roy, 28 April 2015 06:15

MeetingMinutes-150414.pdf (59.8 KB) Hanlet, Pierrick, 28 April 2015 09:00

tracking_measured_misalignments.pdf - Tracking study - for discussion during MEMO/MIPO joint session at 15:00 (411 KB) Rogers, Chris, 28 April 2015 13:28