Can we do an update on the alignment/etc analysis tomorrow, back to the
regular 14:00 slot? In the POD if possible, last time we got turfed out
and ended up in CR10 (round the corner).

http://mice.iit.edu/phonebridge.html

  • Tracker-to-tracker alignment - Melissa/Chris Hunt
  • Tracker alignment to field - Chris Rogers/Sophie
  • Cut-based beam selection vs 2015/01 data - Tanaz/Scott Wilbur
  • Full PID vs 2015/01 data - Celeste
  • PID detector alignment - Francois

Thanks,
Chris

momentum_dependence.pdf (38.7 KB) Wilbur, Scott, 17 September 2015 13:55

MICEDiagnosticsSept172015_T.Mohayai.pdf (5.65 MB) Mohayai, Tanaz Angelina, 17 September 2015 14:16

pid_det_alignment_150917.pdf (2.7 MB) Drielsma, Fran├žois, 17 September 2015 14:23